If repair work life is limited, but I want to create a solid and reliable basis, semi-dry floor screed is able to be a good solution. Used for its creation solution has its own characteristics. We offer to meet with the composition and formation of the intricacies of such a coating.

Dry screed - quality base for decorative floor for a limited time
Dry screed - quality base for decorative floor for a limited time

Read article

  • 1 Specificity and scope of the semi-dry screeds
  • 2 The mixture composition and the requirements to raw materials
  • 3 Performance characteristics semi-dry screed floor
  • 4 Advantages and disadvantages of semi-dry screed floor
  • 5 Kinds semi-laying screed
    • 5.1 on the grounds of
    • 5.2 To "warm floor"
    • 5.3 With reinforcement
    • 5.4 With insulation
    • 5.5 With the installation of acoustic insulation layer
  • 6 Thickness
  • 7 Calculation of material consumption
  • 8 How is the semi-dry floor screed: stacking technology
    • 8.1 Materials and tools
    • 8.2 Preparatory work
    • 8.3 Preparation of the solution for dry screed manually
    • 8.4 fill
    • 8.5 Waiting time for drying

Specificity and scope of the semi-dry screeds

At the device on the basis of a semi-dry screed via Pneumosupercharger (less often by hand) and the mixture was fed moisturized aligned at predetermined beacons. It can be used when working in new homes and old buildings. It demands at floor apparatus housing stock and on construction sites.

You can use a semi-dry screeds in industrial plants and public buildings
You can use a semi-dry screeds in industrial plants and public buildings

Considering the consistency of the composition, semi-dry screed relevant for floors and inclined surfaces having a complex configuration. Relatively light weight makes it possible to perform operations in buildings with thin overlap.

Composition for topical bases with different configurations
Composition for topical bases with different configurations

The mixture composition and the requirements to raw materials

Good thermal, acoustic and waterproofing characteristics of the formed coating due to its composition. To prepare the solution for a semi-dry screed used:

  • waterAdministered in a limited number. Ready mixture should look like wet sand. Water should be taken from the potable source;
  • cement. M 500 is used with sufficient strength characteristics. Its properties directly from the life of the formed ties depends. When buying, make sure the integrity of the packaging and check the time of manufacture;
  • sand. Adding the coarse impurities without soil and clay with a maximum fineness modulus of 2.5;
Cement and sand - the main components
Cement and sand - the main components
  • softener;
  • polypropylene fibrovoloknoPerforming a reinforcing function. Owing to this component increases the strength and elasticity of the composition, reduces the risk of cracking during drying. The finished coating is more resistant to impact and dynamic loading.
Perfectly flat floor: the secrets of using a semi-dry screeds as a basis
Polypropylene fibrovolokno gives the desired properties

Performance characteristics semi-dry screed floor

Semi-dry screed in performance occupies an intermediate position between traditional and dry views. With it possible to eliminate various floor defects, hide supply mains, Improve the sound, heat and waterproofing characteristics base. Ties Strength - 150-250 kg / cm².

Correctly formed coating has high strength
Correctly formed coating has high strength

Formed layer may be used as the basis for all kinds of decorative covering. Due to the formation of a flat surface, you can eliminate the use of leveling liquid mixtures. Perhaps the device rigid and floating screed.

Attention! To shrink the formed layer is required only 1-1.5 hours (average speed - 0.2 mm / min).

Due to the consistency and the presence of microfiber cracking hardly occurs.

Additional training before laying the finishing coat is not required
Additional training before laying the finishing coat is not required

Advantages and disadvantages of semi-dry screed floor

The absence of excess moisture gives a semi-dry screed following advantages:

  • high density, allowing to increase the strength characteristics of the formed object;
  • no shrinkage, ensures a minimum amount of water in the composition of the hardening solution;
  • less time screed maturation, since moisture evaporation occurs in less time than with conventional casting solution;
  • minimum amount of dirt in comparison to conventional technology;
  • the ability to simultaneously perform finishing work in the room, since humidity levels remain at the same level;
  • forming a flat surface which can act as a base for topcoat;
  • short periods repairs. Walk on the coating can be formed over 12 hours, and to perform finishing work - a day.
For the device requires less time screed
For the device requires less time screed

The disadvantage is:

  • complexity of forming precise angles due to poor fluidity of the solution. Composition poorly fills the recess and the other recess and convexities;
  • process complexity. Manually create a semi-dry screed over a large area is difficult. You must use a special expensive equipment;
  • thickness of the formed layer, which is usually longer than 3 cm.
Mikhail Starostin

Comment

Mikhail Starostin

Team leader repair and construction company "Home Premium"

Ask a Question

«Existing weaknesses solution used corrected by introducing a certain amount of plasticizer in the composition and in the corners tamping mass immediately after laying. "

To perform the installation work requires special equipment
To perform the installation work requires special equipment

Kinds semi-laying screed

Laying semi-dry screed floor can be done in different ways. Everything depends on the order in which the premises are carried out repair works, and what the result should be the result obtained. We offer to meet with existing types of installation.

Laying semi-dry screed floor can be done in different ways
Laying semi-dry screed floor can be done in different ways

on the grounds of

A simple embodiment, assuming that the blow-prepared mixture is made directly on the substrate. For this veiled surface pre-dense polyethylene film, and then the mixture is applied distributed evenly over the bottom and compacted.

Waterproofing material must have sufficient density
Waterproofing material must have sufficient density

To "warm floor"

Stacking is made on a semi-dry screeds electric or Warm water floor. The prepared solution was spread evenly over the surface leveled and compacted.

After 24 hours but not later than 72 hours, cut expansion joints having a width of 3-4 mm to a third thickness. Location of expansion joints is selected in such a way that heating circuit with them not intersect either located inside special plastic transition.

Area expansion joints should consider beforehand
Area expansion joints should consider beforehand

With reinforcement

If the operational load on the floor is large enough, when the screed apparatus should take care of additional reinforcement. Using special grid can significantly improve the strength characteristics of the formed layer.

The grid helps to increase the strength of the layer
The grid helps to increase the strength of the layer

With insulation

, Care should be taken further if the units are semi-ties in a cold region, or on the first floor of an apartment or house floor insulation. As thermal insulation material most commonly used mineral wool slabs. The use of other heaters. They are placed on the waterproofing layerWhich is poured from the top layer of the prepared mixture.

Insulation for the floor must have sufficient thickness
Insulation for the floor must have sufficient thickness

With the installation of acoustic insulation layer

laying embodiment, involving the use of a special membrane coating or polyethylene foam, is placed under or over the screed. The first variant is more common. Laying of the web material is performed in such a way as to obtain an overlap of the wall at least 15 cm. Then, grid mounted and produced pouring concrete mortar pulling up a desired thickness. The solution is sealed. Cut seams.

The membrane has a high sound insulation characteristics
The membrane has a high sound insulation characteristics

Thickness

The geometrical parameters of the layer formed is directly dependent on the conditions of the subsequent operation of the floor. The minimum thickness is 3 cm, the optimum - from 4 to 5 cm. With substantial operational bases load size increases. Since the layer thickness of 7 cm is able to withstand a load up to 100 kg / m².

Attention! If the scheduled heating circuit device screed dimensions relate to the diameter of the tubes used.

The thickness of the screed formed depends upon the desired operational characteristics of the floor
The thickness of the screed formed depends upon the desired operational characteristics of the floor

Calculation of material consumption

To ensure the formation of high-quality semi-dry screed for floors, enter into the composition of the mixture components in the correct proportions. For this:

  • mix cement and sifted sand in the ratio 3: 1;
  • was added to each 100 kg of a mixture of 0.8-1 liters of plasticizing substances;
  • introducing into each cube solution of 0.6 kg of fiberglass;
  • adding water in a volume, which allows to obtain a solution with optimum ductility.

Volume of brewed solution will depend on the floor area and the thickness of the cast layer. To calculate the required amount of finished mixture is sufficient to multiply the indicated parameters, expressed in meters. On average, for the device screed 5 cm required 15 kg of cement, 65 liters of sand, water buckets 2-3 and 35-40 g of plasticizer.

The required amount of material to be calculated in advance
The required amount of material to be calculated in advance

How is the semi-dry floor screed: stacking technology

Durability and strength properties of the base is closely linked with the observance of the technological requirements when performing assembly work. We offer to meet with the sequence of actions, following which you will be able to form a coating that can last for many years. Works are carried out manually.

It should adhere driven workflow
It should adhere driven workflow

Materials and tools

At the beginning of installation, the need to have available all necessary for preparation of the solution, as well as:

  • laser level;
  • generally;
  • grater;
  • Master OK;
  • measuring tool;
  • cutter construction;
  • mixer building;
  • polystyrene plates;
  • mesh reinforcement;
  • metal profile;
  • hardware desired size.
The tool used must be of high quality
The tool used must be of high quality

semi-dry floor screed

Preparatory work

Before starting work, clean the floor from dust, dirt and debris. Chipped and uneven grind sandpaper. Cracks previously expanded, embedded solution. If there are pieces of concrete chips, be sure to remove them. Significant differences in height align. Then:

IllustrationDescription of the action
Perfectly flat floor: the secrets of using a semi-dry screeds as a basisSpread on the base of polystyrene plates in a staggered manner. Place on top of the reinforcing mesh with a mesh of 10 to 10 cm.
Perfectly flat floor: the secrets of using a semi-dry screeds as a basisAlong the perimeter of the room damping glue tape, which will provide the required level of sound insulation, and will compensate for thermal expansion. In the absence of special material you can use five millimeter substrate for laminate. Damper glue so that it is approximately 1 cm above was future ties.
Mikhail Starostin

Comment

Mikhail Starostin

Team leader repair and construction company "Home Premium"

Ask a Question

«If you plan to simultaneously fill a semi-dry screed flooring in adjacent rooms should be provided in the doorway of the technological gap and reinforcing mesh reinforcement. "

Preparation of the solution for dry screed manually

If you can not buy a ready-made solution in which the ingredients are mixed in the right ratio, cook it yourself. For this:

IllustrationDescription of the action
Perfectly flat floor: the secrets of using a semi-dry screeds as a basisMix together sand, cement and fibrovolokno plasticizer. Per bag of binder should account for 30 shovels of sand. Preparing a one-time amount. If the amount of the mixture decided to double to mix convenience alternate layers. Carefully shovel twice the resulting volume.

Double amount sufficient for the preparation of 0,25 m³ finished coupler.

Perfectly flat floor: the secrets of using a semi-dry screeds as a basisAdd water in small portions. Per sack of cement is injected slightly more than 1.5 buckets of water. You should get the water-cement ratio of 0.34.
Perfectly flat floor: the secrets of using a semi-dry screeds as a basisAfter waiting 10 minutes, the mixture is moistened thoroughly mixed. We are doing it twice.
Perfectly flat floor: the secrets of using a semi-dry screeds as a basisCheck readiness resulting mixture. Molded lump should turn out tight and damp, but the surface should be moisture. Lump and should not crumble.

fill

By stacking a semi-dry screed proceed immediately after preparation of the solution. Unacceptably long waiting times, since an hour the mixture may be poorly aligned. Doing it this way:

IllustrationDescription of the action
Perfectly flat floor: the secrets of using a semi-dry screeds as a basisForming the border poured screed. To do this, pour the track. Slightly raising the net, helping the composition to be on the plates. Compacted strip formed by hand, kicked, or with a special tool. Pressed into the track formed metal profile, exposing it to the level.
Perfectly flat floor: the secrets of using a semi-dry screeds as a basisPour the mixture into the enclosed space. Lifts the grid to the composition was under it. Compacted mixture.
Perfectly flat floor: the secrets of using a semi-dry screeds as a basisUsing generally redistribute the mixture on the surface, ensuring the formation of a layer of sufficient thickness. It is necessary to achieve a perfect surface leveling.
Perfectly flat floor: the secrets of using a semi-dry screeds as a basisThe next day, to close up the furrow of the lighthouse, using a mixture of a large amount of water. Great hydration is needed because the coating formed on the eve necessarily absorb some moisture.

Attention! Before the formation of the subsequent strip should always be cut at right angles to the edge of the previous one, in order to avoid it breaking off.

We offer watch a video, which clearly shows how the hand can be poured screed:

Waiting time for drying

After one day with the help of rules remove all surface to have bumps. Pour via watering each square with 1.5 liters of water to be compensated occurred evaporation. Spreads across the floor plastic wrap and leave for two weeks, a month. The second option is preferred. The film should fit snugly to form a coating. The presence of the slits is unacceptable, as it can provoke premature evaporation.

The film should adhere tightly to the surface
The film should adhere tightly to the surface

Share in the comments what you screed floor poured in your home, in what way, how long you are exploiting it and if satisfied with the result.