No one wants to do the repair forever. Even if there's no hurry, you still want to have a rough benchmark for repair period. Usually serve as a benchmark event in the life. Someone plans to renovate an apartment for the wedding, someone - to the beginning of the school year. Anyway, starting repairs, everyone is trying to figure out when you can settle in the new apartment. To find out how long the repair will take, you need to understand what factors affect the duration. It seems obvious that the repair time will be a little apartment less than a large repair. But it's not always the case. Based on its experience, Construction company "My repair" It tries to tell what affect the time of repair the apartment.
Read article
- 1 Presence of project
- 2 Types of jobs
- 3 The area of the apartment
- 4 The choice of material
- 5 Interaction with subcontractors
- 6 Summary
Presence of project
Having a clear idea of what you want to get in the end, you make the repair quickly. Already at the stage of creation of the design project can be designated time frame repair.
Improvisation increases the flow of money and time. It is not possible to estimate in advance what it would cost a continuous flight of fancy. Repair - a set of different jobs, from roughing to finishing works. Term of performance of each type of work is regulated by the norms of SNIP and GOST.
It seems: Think, move the column by just five centimeters. However, the apartments in the project, everything is interconnected. Even a small change will entail a number of alterations, which will lead to additional costs. Including - and time.
Types of jobs
Each work corresponds to a certain period of its implementation. For example, the screed will take about 25-35 days to dry. A few days after pouring, you can start working with the walls, but do not turn the floor until the screed is completely dry. Therefore, a rough stage of repair, including the screed have to lay for about two months.
If you have to repair the old apartment, it will take more time. May add additional demolition work. As a rule, these apartments are many pitfalls. For example, if a house built in the 30s of the last century, there certainly are hardwood floors. To assess the state of the lag, you will need to remove the floor.
When the repair involves re-planning, you must allow time for the development of project documentation and its coordination. This is also a work and sometimes long. It can not be done in parallel repairs. If alterations are not approved, and the work has already been done, we will have to change everything. It - expenditure of time and money.
The area of the apartment
The more yardage, the longer repairs. It is not always obvious. Returning to the example of the screed - no matter what floor space, 100 or 30 meters. Depending on the casting thickness, the screed will dry the same, in a large room that small.
In addition to the total area is set to the number of rooms. A few small rooms repairs may take longer than one large one. For example, take the work in the bathroom - it would seem, a small room. However, for this reason it is impossible to accelerate the repair of an increase in the number of employees. They will just interfere with each other.
The choice of material
The material for the roughing and finishing to choose and buy before the renovation. At the same time, bring their whole material in an apartment will not be. This will prevent the work. Ideally, you need to calculate the delivery so that the materials for finishing came to the end of the draft works. Require your contractor work production schedules and delivery of finishing material.
If you decide to order the tiles from abroad, detail disassemble all possible obstacles that may arise on its way to your apartment. Detail here, should not even ask the national peculiarities of the country from which you plan to order the material. For example, in Italy in August - the month of the holiday. This may affect delivery times.
It is important to repair team is not idle while waiting for a finishing material. Violation of the schedule of finishing works will entail a snowball of problems - a delay drags along the other, as a result of the repair will be delayed indefinitely.
Interaction with subcontractors
As a rule, work related to the ventilation and air conditioning, the subcontractor. They may have their eye on the timing of repair work, and it does not necessarily coincide with yours. To avoid problems, you need to combine all kinds of work in a single graph. Experience suggests that it is better to give control over the subcontractors to the prime contractor. The order will be more and less headaches.
It is important that all the participants of repair work to understand their role in the overall process and to clearly represent its temporary borders. If the interaction between the main contractor and the subcontractor organized repair still at a preliminary stage, everything goes on as usual.
Summary
On the repair period affects a lot of details - from what time go to small children neighbors to the presence in the house of the freight elevator. It is important to provide all the factors in preparation for repair. This will save time and money.
The more thorough the preparation is, the less time it will take repair. In order to avoid surprises in the form of lost time to make repairs to the professionals. The company "My repair» Repair ensures no surprises.
In order to properly plan the work schedule of production and supply of finishing materials, "My repair" collects at the round table of all the participants of repair. During this meeting, we are working on all the details. This approach maximizes the customer's interests: a transparent budget, the lack of co-payments in the course of work, repair time and no surprises.