🏠 rostverkovy pile-foundation: types and purpose

click fraud protection

If the site has a fairly complex landscape as a basis for the house should be used pile-foundation rostverkovy. Such base has a high performance and has a number of advantages. We offer to meet with the existing varieties and procedures for installation work.

PHOTO: postroifundament.ru rostverkovy pile-foundation - universal base.
PHOTO: postroifundament.ru
Rostverkovy pile-foundation - universal base.

Read article

  • 1 Rostverkovy pile-foundation: conditions of use
  • 2 Design features and principle of operation
  • 3 The main types of pile-foundation rostverkovogo
    • 3.1 According to the type of binding
    • 3.2 According to the type of pile
    • 3.3 By the method of immersion into the soil
  • 4 Advantages and disadvantages
  • 5 Selection criteria: when the pile-rostverkovy foundation - the best option
  • 6 Design
  • 7 Calculation of the required amount of materials
  • 8 Construction technology: the main stages
    • 8.1 Markup and earthworks
    • 8.2 Formation of a sand cushion
    • 8.3 formwork arrangement
    • 8.4 Mounting piles
    • 8.5 Fill grillage
    • 8.6 Warming and waterproofing
  • 9 Possible errors in the construction of pile-foundation rostverkovogo

Rostverkovy pile-foundation: conditions of use

This ground is able to last for many years, withstanding considerable temperature fluctuations. Suitable for public buildings residential homes. apply for frame structuresAs well as structures built from brick and silicate blocks. Permissible construction in areas with high density, high water table or unstable soils and quicksand.

PHOTO: f136.ru withstands load of brick walls.
PHOTO: f136.ru
Withstand load of the brick walls.

Design features and principle of operation

Rostverkovy pile-foundation consists of piles and grillage. Last - a slab or beam connecting support each other. Mounted above the ground. Is monolithic, precast-monolithic teams.

PHOTO: montag-rb.ru rostverkovy pile-foundation consists of towers and raft foundation.
PHOTO: montag-rb.ru
Rostverkovy pile-foundation consists of towers and raft foundation.

Compound supports together using a grillage facilitates uniform load distribution. This is true in the construction block or brick buildings.

PHOTO: teremforum.ru Rostwerk rivetted.
PHOTO: teremforum.ru
Raft foundation distributes the load.

The main types of pile-foundation rostverkovogo

Design of pile-foundation rostverkovogo may differ. For his device can be used various types of supports. We offer to get acquainted with the main types, to make it easier to opt for a particular type of base.

PHOTO: vitoslavica.ru Execution pile-foundation rostverkovogo may differ.
PHOTO: vitoslavica.ru
Execution of pile-foundation rostverkovogo may differ.

According to the type of binding

For manufacturing steel grillage channel can be used either reinforced concrete. The most widely used second type. This design is able to withstand considerable loads. If erected Combining, garage or skeleton structureYou can use metal piping.

PHOTO: superfundamentufa.ru reinforced concrete able to withstand considerable loads.
PHOTO: superfundamentufa.ru
Reinforced concrete able to withstand considerable loads.

According to the type of pile

Depending on the type of supports, pile-rostverkovy foundation can be:

  1. Screw. similar to base on screw pilesBut it has disposed on grillage supports. piling metal, have a large diameter. Their lower part is performed with the pointed blades for easy tightening.
  2. Bored. The supports are formed inside the asbestos cement pipes are used as permanent formwork. Optimal variant at the device base by hand.
  3. Precast. Allows the use of hollow pillars and solid, made of steel, wood, concrete. Mounted in the prepared hole, the depth of which is equal to the third bearing length.
PHOTO: vitoslavica.ru Bored piles are quite popular.
PHOTO: vitoslavica.ru
Bored piles are quite popular.

By the method of immersion into the soil

Rostverkovy pile-foundation, depending on the method of dipping poles in the ground, can be divided into:

  • Drop. For piling used buses;
  • printed. First, wells are drilled, then the prepared hole poured concrete;
  • screw. For screwing the supports used special equipment.
PHOTO: sdmco.ru Driven Piles sink into the ground with the help of special equipment.
PHOTO: sdmco.ru
Driven piles sink into the ground with the help of special equipment.

Advantages and disadvantages

For pile-foundation rostverkovogo characterized by a number of advantages. Such a foundation:

  • available. The minimum amount of earthwork significantly reduces the cost of installation of foundations;
  • stable. Due to the large load-bearing capacity can be used for the construction of multi-storey buildings made of heavy materials;
  • universally. The best option for most soils and sites with any landscape. The groundwater level is also not important;
  • allows separate installation of piles and pile cap, allowing you to reduce the cost of the concrete mixture;
  • It allows you to select the location of the piles, taking into account the passage of underground utilities. This greatly simplifies the design works;
  • It has a high strength. Provided that all installation work has been carried out in compliance with the rules, pile-rostverkovy foundation is not deformed during the operation;
  • It allows you to refuse to carry out the preparatory work;
  • It has good insulating properties;
  • significantly reduces the risk of flooding at home when choosing a pile structures of sufficient height;
  • easy to assemble. The works can be carried out independently;
  • It is formed in a short time.
PHOTO: kabrus.ru suitable option for areas with any landscape.
PHOTO: kabrus.ru
A suitable embodiment for areas with any terrain.

The disadvantage is:

  • the complexity of the construction in areas with rocky soil, as they problem is sufficient to establish the pile;
  • the need to perform additional Thermal insulation work in the construction of homes in the region with a harsh climate;
  • impossibility device basement or ground floor;
  • necessity calculation of the bearing capacity of the supportsWhich is difficult to do yourself.

From devices rostverkovogo pile-foundation is to give in the construction of a detached house on a plot with a horizontal displacement of the soil or with significant shrinkage. This could trigger a violation of the stability of the supports.

PHOTO: sps-str.ru From felling device will have to be abandoned.
PHOTO: sps-str.ru
By felling devices have to be abandoned.

Selection criteria: when the pile-rostverkovy foundation - the best option

Opting for the pile-foundation rostverkovogo done in the event that:

  • plot with a steep slope. Apparatus belt structure it will be difficult;
  • there are elements landscape designWho do not want to break down during the construction of the house;
  • impossible to perform excavation work because of the proximity of adjacent structures;
  • groundwater came close to the surface. high bedding device is fraught with considerable financial expenditure;
  • it is necessary to shorten the construction period;
  • on the site already has utilities. Their presence complicates the construction foundation.
PHOTO: small-house.ru In some cases rostverkovy pile-foundation - the best option.
PHOTO: small-house.ru
In some cases rostverkovy pile-foundation - the best option.

Design

Before installation is done the exact calculation of pile-rostverkovogo foundation that starts with Elaboration of the future building and drawing the base sketch. Required worked piles arrangement. They are placed in places of intersection of the walls and in the corners.

PHOTO: obetone.com Driving piles location carefully thought out.
PHOTO: obetone.com
piles layout carefully thought out.

Attention! The distance between the piles usually not more than 3 m. The larger value of additional supports are mounted.

Together with the calculation and determination of the number of locations of poles, calculated their height and thickness. For exact calculation you need to know:

  • the mass of the structure erected. Calculate the total weight of finishing materials, furniture, household goods;
  • supporting area. Knowing the weight and considering the reliability coefficient is determined the load on each leg;
  • the dimensions of the piles. It is determined by the area of ​​one support. The total value is compared with a desired reference area.

Calculation of the required amount of materials

Before installation should buy everything you need. Number of piles is calculated by the developed scheme. Material for the manufacture grillage purchased in view of its parameters. To do this, the required volume is determined concrete solution.

PHOTO: stroyfora.ru required amount of material is calculated for a particular design.
PHOTO: stroyfora.ru
The required amount of the material is calculated for a particular design.

Construction technology: the main stages

To pile-rostverkovy foundation able to withstand operational loads during the installation work should be carefully observed technology. We offer to meet with the main stages and their content.

Markup and earthworks

Prior to the start of construction on the site, you prepare the territory. If there are spaces or rocks that prevent the formation of the base, they are removed. The soil is leveled. Apply markup. To determine the position of support pile-foundation rostverkovogo used pegs and thread. It turns out the place the outer and inner walls. Controls the position of the diagonals.

After executing the markup made earthworks. Dig a trench under the grillage. Its width depends on the purpose of erecting the structure. For residential buildings - 0.8 m, for hozpostroek - 0.25 m Depth of the trench -.. 0.7 m hole poles 0.2-0.3 m drill holes for supports. This is done using a suitable tool or special equipment.

Excavation work is performed on preformed markup
Excavation work is performed on preformed markup

Formation of a sand cushion

Prepared by trench geometry controlled by a level. At the bottom is placed sand bed thickness of not less than 0.2 m. For its formation used sand coarse fraction.

Attention! Before compacted sand should be thoroughly wet.

Sand bed should be of sufficient thickness
Sand bed should be of sufficient thickness

formwork arrangement

installation formwork is made on the prepared base. Grillage width must be greater than the thickness of the walls. During assembly, the panels must be securely fixed to prevent displacement under the weight of the cast solution.

PHOTO: skb44.ru formwork is mounted on the perimeter.
PHOTO: skb44.ru
Formwork is mounted on the perimeter.

Mounting piles

Running assembling piles selected method. Props must dive deep enough to prevent their displacement under the influence of adverse factors.

Supports must be placed vertically
Supports must be placed vertically

Fill grillage

After the installation of supports made fill grillage. For this:

IllustrationDescription of the action
Erect the house on any ground, why so popular rostverkovy pile-foundationIt is formed from two ribbed belt reinforcement.
Erect the house on any ground, why so popular rostverkovy pile-foundationReinforcing elements are installed in the appropriate places. They must ensure a steady increase grillage strength.
Erect the house on any ground, why so popular rostverkovy pile-foundationLamellar filling is made concrete. The composition is mixed evenly in volume in order to avoid accumulation of air bubbles.
Erect the house on any ground, why so popular rostverkovy pile-foundationConcrete covered with foil to prevent it from cracking during solidification.
Erect the house on any ground, why so popular rostverkovy pile-foundationAfter solidification of concrete, formwork understands. Controlled geometric parameters generated grillage.

Warming and waterproofing

That the house was warm and comfortable, runs around the perimeter of the house being built waterproofing and warming rostverkovogo pile-foundation. Most often used for this foam and polyurethane foam.

Open space should insulate
Open space should insulate

Possible errors in the construction of pile-foundation rostverkovogo

With self-installation of pile foundation rostverkovogo novice builders often make mistakes that can have a negative effect on the term of the base service in general. Most often, it is:

  • lack of communication between the piles and the raft. In winter, due to soil freezing tipping force can push the pile, causing damage to buildings. Especially if the light materials used for its construction;
  • lack of space under the raft, which can cause damage to the soil at the last movement. To eliminate such a phenomenon in the bottom formwork stacked plates StyrofoamUsed as a shock absorber;
  • lack of depth of the. This can cause shrinkage and construction fill the space between the raft and the ground;
  • error when calculating the bearing capacity of the base due to incorrect determination of the type of soil.
PHOTO: remontnik.ru typical mistakes to avoid when filling foundation.
PHOTO: remontnik.ru
typical mistakes should be avoided by pouring the foundation.

Share in the comments, if you had to mount a pile-rostverkovy foundation? For any structure you choose this basis?